Chief Tactical Officer’s Log

As we prepare for our arrival at Khitomer, a full re-calibration of the phaser targeting subsystems is underway. Hopefully, there won’t be a need for the phasers while we are in Klingon space, but one can never be too careful.

Tactical drills are to be scheduled twice daily, with additional drills at random intervals.

LT Jay Griffin
Chief Tactical Officer

Chief Engineer’s Log

I have updated the computer core to support departments and duty logs. Appropriate pages and categories have been added to the page, post and menu structure.

Operations reported that low temperatures are causing stress fractures at the base of the warp nacelle pylons; structural integrity fields are at 86%. Additionally, environmental controls are experiencing difficulty maintaining comfortable temperatures.

I have repair crews working on the environmental controls. The stress fractures have been repaired and the SIF is back at 100%.